<?xml version="1.0" encoding="utf-8" standalone="yes"?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom">
  <channel>
    <title>Research Section Changelog — The Infinite Unknown</title>
    <link>https://www.jaredwatkins.com/research/changelog/</link>
    <description>Timestamped log of additions and modifications to the Research knowledge base.</description>
    <generator>Hugo -- gohugo.io</generator>
    <language>en-us</language>
    <lastBuildDate>Mon, 11 May 2026 15:03:49 -0400</lastBuildDate><atom:link href="https://www.jaredwatkins.com/research/changelog/index.xml" rel="self" type="application/rss+xml" />
    <item>
      <title>Research Section Changelog</title>
      <link>https://www.jaredwatkins.com/research/changelog/</link>
      <pubDate>Mon, 11 May 2026 15:03:49 -0400</pubDate>
      <author>Jared Watkins</author>
      <guid>https://www.jaredwatkins.com/research/changelog/</guid>
      <description>&lt;blockquote&gt;
&lt;p&gt;&lt;strong&gt;⚠ Disclaimer:&lt;/strong&gt; This entry may be incomplete, out of date, or inaccurate. It is AI-maintained on a best-effort basis. Do not rely on it as a sole source — verify claims independently using the sources listed below.&lt;/p&gt;
&lt;/blockquote&gt;
&lt;ul&gt;
&lt;li&gt;&lt;strong&gt;2026-05-11:&lt;/strong&gt; Created &lt;a href=&#34;/research/datacenter-opposition/state-breakdown/georgia/&#34;&gt;Georgia datacenter opposition&lt;/a&gt; — Project Sail (Prologis/Atlas, 829 acres, ~900 MW, $17B, Coweta County); 3–2 commission approval April 11 2026; lobbyist access scandal (DeSmog investigation); Citizens for Rural Coweta (8,000+ signatures, PAC formation); May 2026 lawsuit to void rezoning; Ashley Park–Wansley 500 kV transmission line (300+ parcels, eminent domain risk). Created &lt;a href=&#34;/research/datacenter-opposition/issues/infrastructure-eminent-domain/&#34;&gt;infrastructure overspill issue&lt;/a&gt; — structural analysis of eminent domain and property displacement from datacenter-serving transmission lines; case studies: Maryland Piedmont Reliability Project, Virginia Dominion loop, NextEra Midatlantic Resiliency Link (PA→VA), Georgia Ashley Park–Wansley; legislative responses; organizing strategy implications. Updated &lt;a href=&#34;/research/datacenter-opposition/&#34;&gt;datacenter-opposition index&lt;/a&gt; — added Project Sail to project tracker; added Georgia to state breakdown; added infrastructure overspill as new key theme and key takeaway.&lt;/li&gt;
&lt;li&gt;&lt;strong&gt;2026-05-05:&lt;/strong&gt; Created &lt;a href=&#34;/research/datacenters/power-infrastructure/hitachi-energy/&#34;&gt;Hitachi Energy&lt;/a&gt; — world&amp;rsquo;s largest transformer manufacturer; $43B backlog (3× three years ago); 40-month large-unit lead times; $6B capacity investment; CEO warned sector &amp;ldquo;overwhelmed&amp;rdquo; by datacenter + energy transition demand; DPA §303 Presidential Determination (Apr 20 2026) a direct policy catalyst. Updated &lt;a href=&#34;/research/datacenters/power-infrastructure/&#34;&gt;power-infrastructure index&lt;/a&gt; — added DPA grid determination context, updated transformer lead times from 2–3 years to 24–40 months, added Hitachi Energy (HPS.A) and updated Eaton (ETN) to incumbents table. Updated &lt;a href=&#34;/research/datacenters/behind-meter-power/ge-vernova-aeroderivative/&#34;&gt;GE Vernova aeroderivative entry&lt;/a&gt; — added DPA §303 determination to Q1 2026 financial snapshot.&lt;/li&gt;
&lt;li&gt;&lt;strong&gt;2026-04-30:&lt;/strong&gt; Updated &lt;a href=&#34;/research/datacenter-opposition/state-breakdown/virginia/&#34;&gt;Virginia datacenter opposition&lt;/a&gt; — Added Compass Datacenters withdrawal from PW Digital Gateway (Apr 30); updated Contested Projects table status to Dead; Brookfield-backed Compass cited legal defeats, stricter regulations, and collapsed political support; QTS status uncertain.&lt;/li&gt;
&lt;li&gt;&lt;strong&gt;2026-04-30:&lt;/strong&gt; Created &lt;a href=&#34;/research/energy/solar/spectrolab/&#34;&gt;Spectrolab&lt;/a&gt; + 2 entries: &lt;a href=&#34;/research/energy/solar/azur-space/&#34;&gt;Azur Space&lt;/a&gt; (German GaAs space solar, 5N Plus subsidiary, 32% 4G32C), &lt;a href=&#34;/research/energy/solar/solaero-technologies/&#34;&gt;SolAero Technologies&lt;/a&gt; (Rocket Lab subsidiary, 1,100+ spacecraft, Ingenuity Mars helicopter).&lt;/li&gt;
&lt;li&gt;&lt;strong&gt;2026-04-29:&lt;/strong&gt; Created &lt;a href=&#34;/research/datacenters/orbital-compute/orbital-compute-economics/&#34;&gt;Orbital Compute: First-Principles Economics&lt;/a&gt; — First-principles analysis of GPU energy budgets in LEO (solar irradiance, Stefan-Boltzmann thermal rejection, GPU power caps), satellite build cost model (bus + payload + I&amp;amp;T), launch cost table (Falcon 9 through Starship projections), per-GPU total deployed cost by scenario, technology gap assessment (ISLs for training, HBM radiation fragility, solar array specific power, satellite manufacturing scale, on-orbit hardware aging), and 10-year cost trajectory through 2036.&lt;/li&gt;
&lt;/ul&gt;
&lt;h2 id=&#34;overview&#34;&gt;Overview&lt;/h2&gt;
&lt;p&gt;&lt;a href=&#34;/research/changelog/index.xml&#34;&gt;Subscribe via RSS&lt;/a&gt;&lt;/p&gt;
&lt;p&gt;This page tracks important additions and modifications to the Research knowledge base. Log entries include:&lt;/p&gt;
&lt;ul&gt;
&lt;li&gt;&lt;strong&gt;New entry creation&lt;/strong&gt; (new company, technology, person, or research page)&lt;/li&gt;
&lt;li&gt;&lt;strong&gt;Major content revisions&lt;/strong&gt; (rewrite of What It Is / How It Works, significant corrections to claims)&lt;/li&gt;
&lt;li&gt;&lt;strong&gt;Supply chain discoveries&lt;/strong&gt; (new shared supplier flags, strategic relationships)&lt;/li&gt;
&lt;li&gt;&lt;strong&gt;Mass updates&lt;/strong&gt; (bulk changes across multiple pages)&lt;/li&gt;
&lt;/ul&gt;
&lt;p&gt;Do not log trivial changes: flag additions, minor formatting, small frontmatter tweaks, or routine fact-checking updates are not logged here.&lt;/p&gt;
&lt;p&gt;Each entry is a one-line timestamped summary.&lt;/p&gt;
&lt;h2 id=&#34;changelog&#34;&gt;Changelog&lt;/h2&gt;
&lt;ul&gt;
&lt;li&gt;&lt;strong&gt;2026-04-29:&lt;/strong&gt; Created &lt;a href=&#34;/research/datacenters/orbital-compute/&#34;&gt;Orbital Compute&lt;/a&gt; subsection + 5 entries: &lt;a href=&#34;/research/datacenters/orbital-compute/google-project-suncatcher/&#34;&gt;Google Project Suncatcher&lt;/a&gt; (TPU satellites, Planet Labs 2027 prototype), &lt;a href=&#34;/research/datacenters/orbital-compute/starcloud/&#34;&gt;Starcloud&lt;/a&gt; (H100 in orbit Nov 2025; $170M Series A unicorn), [SpaceX Orbital](/research/datacenters/orbital-compute/spacex-orbital-compute/) (1M-sat FCC filing; Terafab D3 chips), [Aetherflux](/research/datacenters/orbital-compute/aetherflux/) ($50M, Galactic Brain, Q1 2027), &lt;a href=&#34;/research/datacenters/orbital-compute/kepler-communications/&#34;&gt;Kepler Communications&lt;/a&gt; (largest orbital cluster 40 Orin/10 sats), &lt;a href=&#34;/research/datacenters/orbital-compute/lonestar-data-holdings/&#34;&gt;Lonestar Data Holdings&lt;/a&gt; (lunar DR storage, Athena mission Feb 2026).&lt;/li&gt;
&lt;li&gt;&lt;strong&gt;2026-04-28:&lt;/strong&gt; Added Zydeco Development / Project Hutto (70 MW, withdrawn Apr 17 2026) to &lt;a href=&#34;/research/datacenter-opposition/state-breakdown/texas/&#34;&gt;Texas datacenter opposition&lt;/a&gt; — new case study section, updated contested projects table, updated &lt;a href=&#34;/research/datacenter-opposition/&#34;&gt;section index tracker&lt;/a&gt;.&lt;/li&gt;
&lt;li&gt;&lt;strong&gt;2026-04-28:&lt;/strong&gt; Aligned 6 behind-meter-power entries to steering: &lt;a href=&#34;/research/datacenters/behind-meter-power/caterpillar-solar-turbines/&#34;&gt;Caterpillar/Solar Turbines&lt;/a&gt;, &lt;a href=&#34;/research/datacenters/behind-meter-power/oklo-btm/&#34;&gt;Oklo BTM&lt;/a&gt;, &lt;a href=&#34;/research/datacenters/behind-meter-power/radiant-nuclear/&#34;&gt;Radiant Nuclear&lt;/a&gt;, &lt;a href=&#34;/research/datacenters/behind-meter-power/siemens-energy-btm/&#34;&gt;Siemens Energy BTM&lt;/a&gt;, &lt;a href=&#34;/research/datacenters/behind-meter-power/terrapower-btm/&#34;&gt;TerraPower BTM&lt;/a&gt;, &lt;a href=&#34;/research/datacenters/behind-meter-power/usnc-microreactor/&#34;&gt;USNC/NANO KRONOS MMR&lt;/a&gt; — added Summary, Key Facts, Notable Developments, Claim Verification to each; added steering blocks; expanded source_urls to 4–5 per entry.&lt;/li&gt;
&lt;li&gt;&lt;strong&gt;2026-04-28:&lt;/strong&gt; Restructured &lt;a href=&#34;/research/energy/batteries/lithium-metal/&#34;&gt;Lithium Metal Batteries&lt;/a&gt; — added Summary, Key Facts, Notable Developments (12 milestones 2025–2026), Key Companies &amp;amp; Researchers, Claim Verification, and Risks &amp;amp; Uncertainties sections; updated stale_after_days to 90; expanded source URLs to 8.&lt;/li&gt;
&lt;li&gt;&lt;strong&gt;2026-04-28:&lt;/strong&gt; Expanded &lt;a href=&#34;/research/datacenters/behind-meter-power/wartsila-btm/&#34;&gt;Wärtsilä&lt;/a&gt; — added BESS (Quantum3, 19+ GWh deployed, Eraring 3.1 GWh AU), marine propulsion (cruise, container, island grids), Caribbean projects (USVI, Bahamas, BVI, Bonaire, Cayman), and TAM sizing (marine ~$25.6B; stationary recip ~$64-79B).&lt;/li&gt;
&lt;li&gt;&lt;strong&gt;2026-04-25:&lt;/strong&gt; Created &lt;a href=&#34;/research/datacenters/rugged-edge-compute/vita-48-thermal-standards/&#34;&gt;VITA 48 REDI thermal standards&lt;/a&gt; + 5 entries: &lt;a href=&#34;/research/datacenters/rugged-edge-compute/general-micro-systems/&#34;&gt;GMS&lt;/a&gt; (X7 RAPTOR 1&amp;quot;×4&amp;quot; RuggedCool +75°C &amp;lt;$10K), &lt;a href=&#34;/research/datacenters/rugged-edge-compute/annapolis-micro-systems/&#34;&gt;Annapolis Micro Systems&lt;/a&gt; (WILD100 SOSA VPX; WC34D0 VITA 48.4 LFT), &lt;a href=&#34;/research/datacenters/rugged-edge-compute/core-systems/&#34;&gt;Core Systems&lt;/a&gt; (ATMOS stackable nodes; +60°C GPU), &lt;a href=&#34;/research/datacenters/rugged-edge-compute/lcr-embedded-systems/&#34;&gt;LCR Embedded Systems&lt;/a&gt; (35yr defense chassis integrator; open-source VITA 46.11 manager), &lt;a href=&#34;/research/datacenters/rugged-edge-compute/seven-starlake-liquid-atr/&#34;&gt;7Starlake LFT ATR&lt;/a&gt; (7SL-3500 500W closed-loop VITA 48.4). Updated &lt;a href=&#34;/research/datacenters/rugged-edge-compute/half-rack-embedded-compute/&#34;&gt;half-rack overview&lt;/a&gt; with power/ruggedization specs; &lt;a href=&#34;/research/datacenters/rugged-edge-compute/&#34;&gt;rugged-edge-compute index&lt;/a&gt; supply chain liquid cooling flag.&lt;/li&gt;
&lt;li&gt;&lt;strong&gt;2026-04-25:&lt;/strong&gt; Created &lt;a href=&#34;/research/datacenters/rugged-edge-compute/microtca-standard/&#34;&gt;MicroTCA standard overview&lt;/a&gt; + 3 entries: &lt;a href=&#34;/research/datacenters/rugged-edge-compute/vadatech/&#34;&gt;VadaTech&lt;/a&gt; (Henderson NV; MCH+chassis+AMC; MTCA.0/1/3/4), &lt;a href=&#34;/research/datacenters/rugged-edge-compute/nat-europe/&#34;&gt;N.A.T. GmbH&lt;/a&gt; (Hennef DE; NAT-MCH-G4; CERN/DESY/PSI), &lt;a href=&#34;/research/datacenters/rugged-edge-compute/microtca-in-5g-ran/&#34;&gt;MicroTCA in 5G RAN&lt;/a&gt; (O-RAN DU; PTP/SyncE; 100 GbE fronthaul).&lt;/li&gt;
&lt;li&gt;&lt;strong&gt;2026-04-25:&lt;/strong&gt; Created &lt;a href=&#34;/research/datacenters/rugged-edge-compute/half-rack-embedded-compute/&#34;&gt;half-rack embedded compute form factor&lt;/a&gt; + 4 platform entries: &lt;a href=&#34;/research/datacenters/rugged-edge-compute/neousys-semil-1300/&#34;&gt;Neousys SEMIL-1300&lt;/a&gt; (2U fanless IP67, -40°C), &lt;a href=&#34;/research/datacenters/rugged-edge-compute/asus-ruc-1000/&#34;&gt;ASUS RUC-1000&lt;/a&gt; (600W GPU 2U; half-rack fanless), &lt;a href=&#34;/research/datacenters/rugged-edge-compute/galleon-xsr-half-rack/&#34;&gt;Galleon XSR&lt;/a&gt; (3U NAS 80TB 100 Gbps US-owned), &lt;a href=&#34;/research/datacenters/rugged-edge-compute/seven-starlake-thor200-u8-d/&#34;&gt;7Starlake THOR200-U8-D&lt;/a&gt; (2.5U NAS 64TB Xeon D MIL-STD-810).&lt;/li&gt;
&lt;li&gt;&lt;strong&gt;2026-04-25:&lt;/strong&gt; Created new &lt;a href=&#34;/research/datacenters/edge-ai-accelerators/&#34;&gt;edge-ai-accelerators&lt;/a&gt; subsection with entries for &lt;a href=&#34;/research/datacenters/edge-ai-accelerators/hailo/&#34;&gt;Hailo&lt;/a&gt; (Hailo-8 26 TOPS/2.5W M.2/PCIe, Hailo-15 TSMC 5nm, Raspberry Pi AI HAT+) and &lt;a href=&#34;/research/datacenters/edge-ai-accelerators/edgecortix/&#34;&gt;EdgeCortix&lt;/a&gt; (SAKURA-I/II CGRA architecture, 40+ TOPS, defense/ISR focus, Tokyo HQ). Created 5 new rugged/semi-industrial edge compute entries: &lt;a href=&#34;/research/datacenters/rugged-edge-compute/crystal-group/&#34;&gt;Crystal Group&lt;/a&gt; (Cedar Rapids IA; RE4100 shipboard MIL-STD-901D, RE1900M vehicle-mount), &lt;a href=&#34;/research/datacenters/rugged-edge-compute/neousys/&#34;&gt;Neousys Technology&lt;/a&gt; (Advantech subsidiary; SEMIL-2200/2200GC fanless GPU AI servers), &lt;a href=&#34;/research/datacenters/rugged-edge-compute/premio/&#34;&gt;Premio&lt;/a&gt; (JCO-6000-ORN/JCO-3000-ORN Jetson Orin; RCO + EDGEBoost modular I/O), &lt;a href=&#34;/research/datacenters/rugged-edge-compute/adlink/&#34;&gt;ADLINK Technology&lt;/a&gt; (AXE/DLAP rugged GPU servers; SOSA-aligned OpenVPX; TWSE:6166), &lt;a href=&#34;/research/datacenters/rugged-edge-compute/dfi/&#34;&gt;DFI&lt;/a&gt; (Taiwan industrial fanless computers + GPU AI systems). Updated &lt;a href=&#34;/research/datacenters/rugged-edge-compute/&#34;&gt;rugged-edge-compute index&lt;/a&gt; overview and tracker table.&lt;/li&gt;
&lt;li&gt;&lt;strong&gt;2026-04-25:&lt;/strong&gt; Created &lt;a href=&#34;/research/datacenter-opposition/&#34;&gt;datacenter-opposition&lt;/a&gt; section — regulatory, NIMBY, and grid-impact controversies around datacenter expansion; linked entries for environmental justice advocates, case studies (Mesa AZ water fights, Oregon permitting freezes), and incumbent utility opposition to behind-meter SMR/renewables power models.&lt;/li&gt;
&lt;li&gt;&lt;strong&gt;2026-04-25:&lt;/strong&gt; Created 4 missing BTM power company profiles for &lt;a href=&#34;/research/datacenters/behind-meter-power/&#34;&gt;behind-meter-power&lt;/a&gt; section: &lt;a href=&#34;/research/datacenters/behind-meter-power/terrapower-btm/&#34;&gt;TerraPower Natrium&lt;/a&gt; (345 MW SMR + molten-salt storage, Meta 2.76 GW contract), &lt;a href=&#34;/research/datacenters/behind-meter-power/radiant-nuclear/&#34;&gt;Radiant Kaleidos&lt;/a&gt; (1.2 MWe microreactor, Equinix 20-unit preorder), &lt;a href=&#34;/research/datacenters/behind-meter-power/caterpillar-solar-turbines/&#34;&gt;Caterpillar Solar Turbines&lt;/a&gt; (1–39 MW gas turbines, Vertiv partnership Nov 2025), &lt;a href=&#34;/research/datacenters/behind-meter-power/siemens-energy-btm/&#34;&gt;Siemens Energy&lt;/a&gt; (SGT series 40–200 MW heavy-frame turbines, modular 500 MW plants with Eaton). Resolved 5 Hugo REF_NOT_FOUND errors in _index.md.&lt;/li&gt;
&lt;li&gt;&lt;strong&gt;2026-04-19:&lt;/strong&gt; Created &lt;a href=&#34;/research/quantum-computing/google-quantum-ai/&#34;&gt;Google Quantum AI&lt;/a&gt; — Willow 105-qubit (2024); below-threshold error correction (partially verified, Nature); 2019 supremacy claim classically matched (Frontier ~6 sec); dual-modality expansion to neutral atoms (Mar 2026).&lt;/li&gt;
&lt;li&gt;&lt;strong&gt;2026-04-17:&lt;/strong&gt; Created &lt;a href=&#34;/research/post-quantum-encryption/cryptocurrencies/bitcoin-pqc/&#34;&gt;Bitcoin PQC&lt;/a&gt; — BIP-360 (P2MR soft fork, BTQ testnet Mar 2026) and BIP-361 (coin freeze, Lopp vs. Back debate); ~28–35% BTC supply in long-exposure quantum-vulnerable state; Falcon/FN-DSA primary algorithm candidate; 5–10 year migration timeline estimate.&lt;/li&gt;
&lt;li&gt;&lt;strong&gt;2026-04-17:&lt;/strong&gt; Created &lt;a href=&#34;/research/post-quantum-encryption/cryptocurrencies/ethereum-pqc/&#34;&gt;Ethereum PQC&lt;/a&gt; — EIP-8141 frame transactions (CFI Hegota H2 2026); leanSig/leanXMSS for validator attestation aggregation; pq.ethereum.org devnets active (Mar 2026); Strawmap targets full L1 PQC by ~2029; ~90M ETH at quantum exposure.&lt;/li&gt;
&lt;li&gt;&lt;strong&gt;2026-04-17:&lt;/strong&gt; Created &lt;a href=&#34;/research/post-quantum-encryption/cryptocurrencies/other-chains-pqc/&#34;&gt;Other Chains PQC&lt;/a&gt; — Algorand (Falcon live on mainnet Nov 2025, first PQC mainnet tx); Solana (ML-DSA testnet 3,000 TPS Dec 2025); Cardano (Project Nightstream, Google/Microsoft collaboration Feb 2026); QRL (purpose-built XMSS→ML-DSA; Testnet V2 Mar 2026); exchange and wallet readiness (Coinbase advisory board; Trezor Safe 7).&lt;/li&gt;
&lt;li&gt;&lt;strong&gt;2026-04-17:&lt;/strong&gt; Updated &lt;a href=&#34;/research/post-quantum-encryption/cryptocurrencies/&#34;&gt;Cryptocurrencies PQC index&lt;/a&gt; — Phase 2 now active; platform status summary table; Google March 2026 paper context.&lt;/li&gt;
&lt;li&gt;&lt;strong&gt;2026-04-17:&lt;/strong&gt; Updated &lt;a href=&#34;/research/post-quantum-encryption/networking/other-vendors/&#34;&gt;Networking PQC vendor survey&lt;/a&gt; — Added confirmed GA release versions: Fortinet FortiOS 7.6.1 (earliest GA), Palo Alto PAN-OS 12.1 Orion (Aug 2025, broadest coverage), Check Point Gaia R82 (API-only), Cisco IOS XE 26 (full-stack Apr 2026) + ASA 9.19/FTD roadmap; OpenSSL 3.5 (ML-KEM default TLS); strongSwan 6.0.0; WireGuard PSK workaround; Cloudflare One (Feb 2026); Nokia ANYsec/QKD distinction; draft-ietf-ipsecme-ikev2-mlkem-05 IANA gap noted.&lt;/li&gt;
&lt;li&gt;&lt;strong&gt;2026-04-17:&lt;/strong&gt; Updated &lt;a href=&#34;/research/post-quantum-encryption/networking/&#34;&gt;Networking PQC index&lt;/a&gt; — Vendor table updated with confirmed GA release versions; research status updated.&lt;/li&gt;
&lt;li&gt;&lt;strong&gt;2026-04-17:&lt;/strong&gt; Updated &lt;a href=&#34;/research/post-quantum-encryption/&#34;&gt;Post-Quantum Encryption section index&lt;/a&gt; — Phase 2 marked in progress; research phases table expanded.&lt;/li&gt;
&lt;li&gt;&lt;strong&gt;2026-04-15:&lt;/strong&gt; Created &lt;a href=&#34;/research/semiconductors/fabrication-equipment/lasertec/&#34;&gt;Lasertec&lt;/a&gt; — EUV mask inspection monopoly; TSE:6920; actinic inspection sole supplier; Japan export controls; FY2025 ¥251.5B revenue.&lt;/li&gt;
&lt;li&gt;&lt;strong&gt;2026-04-15:&lt;/strong&gt; Created &lt;a href=&#34;/research/semiconductors/&#34;&gt;Semiconductors section&lt;/a&gt; and &lt;a href=&#34;/research/semiconductors/fabrication-equipment/&#34;&gt;Fabrication Equipment subsection&lt;/a&gt; — supply chain table, public company index with TradingView widget, steering guide for equipment and export controls.&lt;/li&gt;
&lt;li&gt;&lt;strong&gt;2026-04-15:&lt;/strong&gt; Created &lt;a href=&#34;/research/post-quantum-encryption/&#34;&gt;Post-Quantum Encryption section&lt;/a&gt; — Phase 1 (networking): Sitehop, Juniper, and multi-vendor survey; Phase 2 (crypto) placeholder; full steering document with NIST FIPS 203/204/205 background.&lt;/li&gt;
&lt;li&gt;&lt;strong&gt;2026-04-15:&lt;/strong&gt; Created &lt;a href=&#34;/research/post-quantum-encryption/networking/sitehop-pqc-support/&#34;&gt;Sitehop&lt;/a&gt; — UK PQC networking startup; FPGA-accelerated ML-KEM IPsec; University of Bristol spin-out; claim verification: line-rate PQC partially verified, govt contracts unverified.&lt;/li&gt;
&lt;li&gt;&lt;strong&gt;2026-04-15:&lt;/strong&gt; Created &lt;a href=&#34;/research/post-quantum-encryption/networking/juniper-pqc-support/&#34;&gt;Juniper PQC Support&lt;/a&gt; — Juniper (now HPE division) IKEv2/IPsec PQC roadmap; Junos OS status; GA release unconfirmed from public sources.&lt;/li&gt;
&lt;li&gt;&lt;strong&gt;2026-04-14:&lt;/strong&gt; Created &lt;a href=&#34;/research/quantum-computing/d-wave/&#34;&gt;D-Wave Quantum&lt;/a&gt; — quantum annealer (not gate-based); Advantage2 4,400+ qubits; 2025 Science supremacy claim actively disputed; $550M QCI acquisition for gate-model entry.&lt;/li&gt;
&lt;li&gt;&lt;strong&gt;2026-04-07:&lt;/strong&gt; Created &lt;a href=&#34;/research/quantum-computing/rigetti/&#34;&gt;Rigetti&lt;/a&gt; — Rigetti Computing (NASDAQ: RGTI) superconducting QPU vendor; Ankaa-3 84-qubit system; Fab-1 in-house foundry; FY2024 revenue $10.8M; documented 2022 roadmap miss.&lt;/li&gt;
&lt;li&gt;&lt;strong&gt;2026-04-07:&lt;/strong&gt; Created &lt;a href=&#34;/research/quantum-computing/skywater-technology/&#34;&gt;SkyWater Technology&lt;/a&gt; — U.S. DOD Trusted Foundry; pending $1.8B IonQ acquisition (shareholder vote May 8, 2026); FY2025 revenue $442.1M. Updated IonQ entry and section index.&lt;/li&gt;
&lt;li&gt;&lt;strong&gt;2026-04-07:&lt;/strong&gt; Created &lt;a href=&#34;/research/quantum-computing/psiquantum/&#34;&gt;PsiQuantum&lt;/a&gt; — silicon photonics FTQC startup; $2.32B raised; DARPA QBI US2QC final phase selected; Victor Peng Interim CEO (Feb 2026).&lt;/li&gt;
&lt;li&gt;&lt;strong&gt;2026-04-06:&lt;/strong&gt; Created &lt;a href=&#34;/research/quantum-computing/ibm-quantum/&#34;&gt;IBM Quantum&lt;/a&gt; — superconducting QPU; qLDPC error correction progress; 2029/2033 FTQC roadmap; Qiskit cloud platform.&lt;/li&gt;
&lt;li&gt;&lt;strong&gt;2026-04-05:&lt;/strong&gt; Created &lt;a href=&#34;/research/quantum-computing/&#34;&gt;quantum-computing section&lt;/a&gt; with initial entries: &lt;a href=&#34;/research/quantum-computing/ionq/&#34;&gt;IonQ&lt;/a&gt;, &lt;a href=&#34;/research/quantum-computing/quantinuum/&#34;&gt;Quantinuum&lt;/a&gt;, &lt;a href=&#34;/research/quantum-computing/xanadu/&#34;&gt;Xanadu&lt;/a&gt;.&lt;/li&gt;
&lt;li&gt;&lt;strong&gt;2026-04-05:&lt;/strong&gt; Created &lt;a href=&#34;/research/quantum-computing/xanadu/&#34;&gt;Xanadu&lt;/a&gt; — photonic QC; Borealis Nature 2022 advantage claim; Aurora 12-qubit system; March 2026 IPO (XNDU); $250M+ raised.&lt;/li&gt;
&lt;li&gt;&lt;strong&gt;2026-04-05:&lt;/strong&gt; Created &lt;a href=&#34;/research/quantum-computing/quantinuum/&#34;&gt;Quantinuum&lt;/a&gt; — trapped-ion; Helios 98 qubits, 99.921% 2Q fidelity; 94 logical qubits milestone; Honeywell ~54% ownership.&lt;/li&gt;
&lt;li&gt;&lt;strong&gt;2026-04-05:&lt;/strong&gt; Created &lt;a href=&#34;/research/quantum-computing/ionq/&#34;&gt;IonQ&lt;/a&gt; — trapped-ion; Forte/Tempo hardware; FY2024/2025 revenue from SEC filings; Skyloom/SkyWater acquisitions; all-founder departures.&lt;/li&gt;
&lt;li&gt;&lt;strong&gt;2026-04-04:&lt;/strong&gt; Reorganized &lt;a href=&#34;/research/energy/batteries/&#34;&gt;energy/batteries&lt;/a&gt; by value-chain layers; added cross-cutting insights and Q1 2026 updates across 12+ companies including tariff and supply chain impacts.&lt;/li&gt;
&lt;li&gt;&lt;strong&gt;2026-04-04:&lt;/strong&gt; Created &lt;a href=&#34;/research/energy/batteries/hyperstrong/&#34;&gt;HyperStrong&lt;/a&gt; — top-5 global BESS integrator; added to Systems Integrators table.&lt;/li&gt;
&lt;li&gt;&lt;strong&gt;2026-04-04:&lt;/strong&gt; Created &lt;a href=&#34;/research/energy/batteries/cnte/&#34;&gt;CNTE&lt;/a&gt; — Contemporary Nebula Technology Energy battery entry.&lt;/li&gt;
&lt;/ul&gt;
</description>
    </item>
  </channel>
</rss>
